[FSG-public] St Pete back online.

Bryan Fields bryan at flscg.org
Tue Oct 10 18:19:12 EDT 2017


Ryan and I made it over to the St Pete site today and fixed the post Irma
woes.  We thought the system had rotated, or at least bent over a bit.  What
we found was the pipe used to support the sectors had folded over completely.

We replaced it with a 10' schedule 40 pipe, which should be much stronger than
the fence pipe.

Here's some pictures of the failure and repair:
https://imgur.com/gallery/SgffK

73's
-- 
Bryan Fields, W9CR
Florida Simulcast Group, Inc.


More information about the FSG-public mailing list